Project Info

Client:
Nuqul Group

Consultant:
Modern Engineering Group & Design Associates & Research Bureau (Darb).

Total Project Value:
100 Million USD

Project duration:
2006 - 2007

Project Description

This project is an advanced hygienic paper mill factory with an extraordinary structure, which contains a lot of different shapes and capacities; the production of top slabs, tanks, trenches, electrical and mechanical manholes and pits, different kinds of pipes, a big number of sophisticated machine foundations, retaining walls, pipe racks, box culverts, as well as finishing works such as block, plaster, different kinds of tile, cable racks, cables, lighting, air conditioning, ducts, a sanitary system and a storm water system.

Total concrete quantity of 25000 m3 with 2700 tons of steel reinforcement.