Project Info

Client:
Jordan Magnesia Co.

Consultant:
Jacobs Engineering Inc.

Total Project Value:
80 Million USD

Engineer:
J.V. Agra Monenco (AMEC) & Attilla Dogan

Project duration:
1999-2002

Project Description

The construction included the following:

  • Civil works and foundations for plant steel structure buildings.
  • Elevated foundations for Rotary Lime Kiln 8 m x 6 m x 7 m.
  • Construction of huge storage silos foundations (one pour 2000 m2).
  • Service Buildings including 2000 m2 finishing.
  • Six sub-stations 6 meters high 4000 m2.
  • Storm and sanitary systems (GRP, DIP, and UPVC pipes).
  • A fire fighting system.
  • Soil cement stabilizations.
  • Road asphalt paving 150000 m2.
  • Reinforced Concrete 37000 m2, re-bars 3000 ton.