Project Info

Client:
Ministry of Water & Irrigation - Morganti Group Inc.

Consultant:
CDM International Inc.

Total Project Value:
30 Million USD

Project duration:
1997-1999

Project Description

The Plant is located 270 km to the south of Amman. The following works were executed:

  • Two oxidation tanks 7 m x 17 m x 6 m.
  • Two clarification tanks - circular shape 14 m Dia. x 5 mh.
  • Two sludge holding tanks - conical shape 10 m Dia. x 15 mh.
  • Two sets of drying beds 82 m x 35 m.
  • Flood retaining wall 165 m.r. x 8 mh.
  • Wadi Mousa Pump Station 72 mh x 27 mh x 8 mh.
  • Taiba Pump Station 30 mh x 14 mh x 8 mh.
  • During the construction, 17000m3 of concrete were poured with 2000 tons of steel reinforcement.